Volume 12 Issue 2
Jun.  2006
Turn off MathJax
Article Contents
DING Ji-xin, YANG Zhi-fa, SHANG Yan-jun, 2006. CAUSE ANALYSIS AND QUANTITATIVE ZONATION OF MUDFLOW HAZARDS ALONG THE RAWU-LUNANG SECTION, SICHUAN-TIBET HIGHWAY. Journal of Geomechanics, 12 (2): 203-210,226.
Citation: DING Ji-xin, YANG Zhi-fa, SHANG Yan-jun, 2006. CAUSE ANALYSIS AND QUANTITATIVE ZONATION OF MUDFLOW HAZARDS ALONG THE RAWU-LUNANG SECTION, SICHUAN-TIBET HIGHWAY. Journal of Geomechanics, 12 (2): 203-210,226.

CAUSE ANALYSIS AND QUANTITATIVE ZONATION OF MUDFLOW HAZARDS ALONG THE RAWU-LUNANG SECTION, SICHUAN-TIBET HIGHWAY

More Information
  • Received: 2005-10-10
  • Published:
  • Unique geological,geomorphic,hydrological and climatic conditions cause various kinds of mountainous hazards,especially very serious mudflow hazards,to occur frequently in the Rawu-Lunang section,Sichuan-Tibet Highway.On the basis of previous research and the authors' field investigations,it is thought that the complex geological structures,strong crust movements and rivers erosions,frequent earthquakes,abundant loose deposits,favorable geomorphology,well-developed modern glaciers and plentiful precipitation are the principal causes of triggering frequent mudflows in the study area.For the purpose of more effective disaster prevention and reduction,the rock engineering system(RES) method is adopted to make a quantitative zonation of mudflows in the study area.By comparing the quantitative mudflow zonation with the preliminary qualitative zonation and distribution of mudflows,it is verified that the quantitative mudflow zonation method is correct and feasible.

     

  • loading
  • 加载中

Catalog

    Article Metrics

    Article views (220) PDF downloads(9) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return