Volume 6 Issue 1
Mar.  2000
Turn off MathJax
Article Contents
SUN Ye, ZHAO Xian, XU Xiang-ying, et al., 2000. AN ANALYSIS OF THE ACTIVITY OF THE SHENZHEN FAULT ZONE IN THE TUNNEL ENGINEERING IN SHENZHEN MUNICIPALITY. Journal of Geomechanics, 6 (1): 59-68.
Citation: SUN Ye, ZHAO Xian, XU Xiang-ying, et al., 2000. AN ANALYSIS OF THE ACTIVITY OF THE SHENZHEN FAULT ZONE IN THE TUNNEL ENGINEERING IN SHENZHEN MUNICIPALITY. Journal of Geomechanics, 6 (1): 59-68.

AN ANALYSIS OF THE ACTIVITY OF THE SHENZHEN FAULT ZONE IN THE TUNNEL ENGINEERING IN SHENZHEN MUNICIPALITY

More Information
  • Received: 1999-01-11
  • Published:
  • After an analysis of the evolution of the activity of the Shenzhen fault zone numerical simulations of both plane-and 3-D present tectonic stress fields are made to calculate quantitatively the angle enclosed between the maximum horizontal principal compressive stress direction and the tunnel axis at different sections of the Shenzhen water diversion tunnel.The displacements of the faults at the intersections between them and the tunnel and the possible stress states of four deep buried sectors of the tunnel are also obtained by the modeling.The results will provide data for the design of the planned tunnel construction.

     

  • loading
  • 加载中

Catalog

    Article Metrics

    Article views (197) PDF downloads(10) Cited by()
    Proportional views
    Related

    /

    DownLoad:  Full-Size Img  PowerPoint
    Return
    Return